Perusahaan

PT Amman Mineral Nusa TenggaraLihat lainnya

addressAlamatSumbawa Barat, Nusa Tenggara Barat
type Bentuk pekerjaanPenuh waktu
KategoriIT / Komputer

Uraian Tugas

Some of your duties will include:

  • Responsible to optimizing the efficiency and effectiveness of the POWER PLANT operations; ensuring that the plant operates at its peak performance, contributing to economic and environmental goals.
  • Analyzing and optimizing the performance of the power generation process. This role involves a deep understanding of thermodynamics, fluid mechanics, and POWER PLANT systems, particularly in the context of COMBINED CYCLE operations.
  • Conduct thorough analysis of plant operations including gas turbines, steam turbines, and heat recovery steam generators (HRSG). Identify performance metrics and benchmarks.
  • Develop and implement strategies to improve the efficiency of the POWER PLANT. Focus on enhancing the thermal efficiency of the COMBINED CYCLE process.
  • Collect, manage, and analyze data related to plant performance. Utilize advanced data analysis tools and techniques to assess operational efficiency.
  • Identify, diagnose, and resolve issues affecting plant performance. Provide technical expertise in addressing operational challenges.
  • Prepare detailed performance reports. Document findings and make recommendations for improvements.
  • Lead and participate in projects aimed at enhancing plant performance. Coordinate with different departments and external vendors as required.
  • Stay informed about the latest developments in POWER PLANT technology. Evaluate and recommend new technologies or modifications to existing systems to improve performance.
  • Ensure that performance enhancement initiatives comply with environmental and safety regulations.
  • Work closely with other engineers, plant operators, and management. Communicate effectively across different levels of the organization.
  • Foster a culture of continuous improvement in plant operations. Conduct regular reviews and update performance enhancement strategies.

What skills and experience do you need?

  • Bachelor’s degree in Mechanical, Electrical, or Chemical Engineering. A Master’s degree in a related field is advantageous.
  • Has related field with 7 years’ related experiences. Strong background in POWER PLANT operations, especially in a COMBINED CYCLE facility. 
  • General knowledge of all areas of industrial COMBINED CYCLE POWER PLANT maintenance; Competency and knowledge of the basic plant layout, equipment and systems of a large industrial project; In-depth knowledge of COMBINED CYCLE POWER PLANT operations and performance metrics. Understanding of environmental and safety regulations; 
  • Familiarity with performance analysis tools and methodologies; proficiency in data analysis software, and a solid understanding of thermodynamics and fluid mechanics.
  • Certifications in energy management or plant operations (such as Certified Energy Manager) are beneficial.
  • Excellent communication skills in English both verbal and written and computer literate.
  • Strong computer skills and be competent in all Microsoft Office software programs, as well as project-specific software.
  • Strong leadership and interpersonal skills; good in coaching/mentoring; good analytical; conflict resolution. 
Refer code: 595169. PT Amman Mineral Nusa Tenggara - Hari sebelumnya - 2024-01-27 12:43

PT Amman Mineral Nusa Tenggara

Sumbawa Barat, Nusa Tenggara Barat

Bagikan pekerjaan dengan teman

Pekerjaan terkait

Engineer Performance – Combined Cycle Power Plant

MECHANIC DIESEL – POWER PLANT

Amman

Sumbawa, Nusa Tenggara Barat

2 bulan yang lalu - dilihat

MECHANIC TURBINE – POWER PLANT

Amman

Sumbawa, Nusa Tenggara Barat

2 bulan yang lalu - dilihat

OPERATOR FIELD BOILER – POWER PLANT

Amman

Sumbawa, Nusa Tenggara Barat

2 bulan yang lalu - dilihat

ELECTRIC HV – TRANSMISSION DISTRIBUTION – POWER PLANT

Amman

Sumbawa, Nusa Tenggara Barat

2 bulan yang lalu - dilihat

MECHANIC COAL PLANT – POWER PLANT

Amman

Sumbawa, Nusa Tenggara Barat

2 bulan yang lalu - dilihat

Superintendent Operations - Combined Cycle Power Plant

Amman

Sumbawa, Nusa Tenggara Barat

2 bulan yang lalu - dilihat

Engineer Mechanical - Combined Cycle Power Plant

Amman

Sumbawa, Nusa Tenggara Barat

2 bulan yang lalu - dilihat

Engineer Electrical - Combined Cycle Power Plant

Amman

Sumbawa, Nusa Tenggara Barat

2 bulan yang lalu - dilihat

SENIOR ENGINEER PROCESS – POWER PLANT

Kementerian Ketenagakerjaan

Sumbawa, Nusa Tenggara Barat

3 bulan yang lalu - dilihat

POWER PLANT LONG-TERM PLANNER

Kementerian Ketenagakerjaan

Sumbawa, Nusa Tenggara Barat

3 bulan yang lalu - dilihat

POWER PLANT LONG-TERM PLANNER

Pt. Amman Mineral Nusa Tenggara/84457

Sumbawa, Nusa Tenggara Barat

3 bulan yang lalu - dilihat

COORDINATOR MAINTENANCE POWER PLANT

Pt. Amman Mineral Nusa Tenggara/84457

Sumbawa, Nusa Tenggara Barat

3 bulan yang lalu - dilihat

SENIOR ENGINEER PROCESS – POWER PLANT

Pt. Amman Mineral Nusa Tenggara/84457

Sumbawa, Nusa Tenggara Barat

3 bulan yang lalu - dilihat

FIELD TECHNICIAN ELECTRICAL – COMBINED CYCLE POWER PLANT

Amman

Sumbawa, Nusa Tenggara Barat

3 bulan yang lalu - dilihat

SPECIALIST – DISTRIBUTED CONTROL SYSTEM (DCS) – COMBINED CYCLE POWER PLANT

Amman

Sumbawa, Nusa Tenggara Barat

3 bulan yang lalu - dilihat

FIELD TECHNICIAN CONTROL & INSTRUMENTATION – COMBINED CYCLE POWER PLANT

Amman

Sumbawa, Nusa Tenggara Barat

3 bulan yang lalu - dilihat

FIELD TECHNICIAN MECHANICAL – COMBINED CYCLE POWER PLANT

Amman

Sumbawa, Nusa Tenggara Barat

3 bulan yang lalu - dilihat

OPERATOR CONTROL ROOM – COMBINED CYCLE POWER PLANT

Amman

Sumbawa, Nusa Tenggara Barat

3 bulan yang lalu - dilihat