Office Address : INPEX MASELA, Ltd. Sentral Senayan I, 13th Floor, Jl. Asia Afrika No.8, Jakarta 10270, Indonesia.
Work location : DKI JAKARTA
Country : Indonesia
Published date : 18 hours ago
Deadline date : 26 Apr 2024
Kini Kami hadir dengan sebuah SOLUSI menemukan lowongan kerja lebih mudah dan lebih dekat dengan HRD Perusahaan dengan JOBSMIGAS PREMIUM
Job Description
• Monitor management of integration best practices in oil and gas project development around the world, and develop and propose engineering integration consisting of methodologies, policy and procedures, standards, etc., for overall project activities as integration guidelines; to ensure available standards and/or adopted standards for engineering integration of FPSO production system as guidelines;
• Administer integration, act as person in charge (PIC) for change issues, and ensure project changes are identified, documented, reported, and monitored to closure;
• Review, monitor and evaluate the implementation of integration methodology, policy and procedures, standards, etc. on arisen change in project activities, and monitor interface communication among related Parties, issues, and potential risks; to ensure interface management of each arisen change is implemented properly within the timelines, and minimize unpredictable change impact;
• Develop and/or implement early identification and tracking system and tools of all potential changes, develop and maintain change registers and issue reports as well as log and track all changes and their status including closed items.
Requirements
• Bachelor degree in Engineering or any other Technical Sciences.
• Minimum 10 years in Project Engineering within upstream hydrocarbon or manufacturing industry. FPSO and/ or FLNG project experiences are preferred.
INPEX acquired a 100% interest in the Masela Block in November 1998 through an open bid conducted by the Indonesian government authorities and subsequently went about exploratory activities as the operator, discovering the Abadi Gas Field through the first exploratory well drilled in 2000. The Company subsequently drilled two appraisal wells in 2002 and four in 2007–2008, all of which confirmed the presence of gas and condensate reservoirs.In December 2010, the authorities approved the initial plan of development (POD-1) deploying a floating LNG (FL...
More