Office Address : INPEX MASELA, Ltd. Sentral Senayan I, 13th Floor, Jl. Asia Afrika No.8, Jakarta 10270, Indonesia.
Work location : DKI JAKARTA
Country : Indonesia
Published date : 18 hours ago
Deadline date : 26 Apr 2024
Kini Kami hadir dengan sebuah SOLUSI menemukan lowongan kerja lebih mudah dan lebih dekat dengan HRD Perusahaan dengan JOBSMIGAS PREMIUM
Job Description
• Responsible for the overall Systems Engineering. Contribute and assure the basis of design, functional design and execution specification and multiple FEED deliverables. Responsible for ensuring sufficient quality of deliverables are achieved to pass project assurance events at the end of FEED and ahead of Final Investment Decision for the project;
• Provide sufficient depth of analysis of functional requirements and associated impact on an optimized scope. Review and responsible for subsea process flow diagrams, piping and instrumentation, subsea connector selection, sparing logic and application of redundancy across the system as well as preservation, storage (wet park) and maintenance decisions. Responsible for leak detection and annulus management requirements and scope solutions analysis;
• Responsible for Subsurface, Wells, Flow Assurance, FPSO, and Export Pipeline. Analyze Subsurface and Flow Assurance advancements technically during FEED with attention to change management. Perform as an active leader in SURF contractors and suppliers HSSE and risk events.
Requirements
• Bachelor degree in Engineering or any other Technical Sciences.
• A minimum of 10 years in the Oil and Gas Exploration and Production industry including Project Delivery with minimum of 5 years’ experience in Subsea Engineering. Experience in Subsea Project execution of EPCI and achieving start-up and first production is preferable.
INPEX acquired a 100% interest in the Masela Block in November 1998 through an open bid conducted by the Indonesian government authorities and subsequently went about exploratory activities as the operator, discovering the Abadi Gas Field through the first exploratory well drilled in 2000. The Company subsequently drilled two appraisal wells in 2002 and four in 2007–2008, all of which confirmed the presence of gas and condensate reservoirs.In December 2010, the authorities approved the initial plan of development (POD-1) deploying a floating LNG (FL...
More