Office Address : INPEX MASELA, Ltd. Sentral Senayan I, 13th Floor, Jl. Asia Afrika No.8, Jakarta 10270, Indonesia.
Work location : DKI JAKARTA
Country : Indonesia
Published date : 18 hours ago
Deadline date : 26 Apr 2024
Kini Kami hadir dengan sebuah SOLUSI menemukan lowongan kerja lebih mudah dan lebih dekat dengan HRD Perusahaan dengan JOBSMIGAS PREMIUM
Job Description
• Progress detail mud engineering studies during FEED phase; Review, analyze and recommend standard, plan and target for mud engineering during drilling and completion activities; Optimize mud and completion fluid design effectively and efficiently with low HSE risks; Evaluate and define risk and opportunities analysis;
• Study and prepare draft programs for drilling mud and completion fluid in line with Local laws, SKK Migas rules and regulations, INPEX standards and manuals;
• Prepare technical requirement regarding mud services contract; Prepare and recommend contract and procurement strategy, technical functional specifications and scope of work of mud and related services (e.g. solid control);
• Prepare drilling mud and completion fluid cost estimation for IVAS DP4 and FID. Prepare work program and budget /AFEs in order to ensure required budget and plan for mud engineering studies and program; Progress regulatory compliance process to be able to obtain approval as per schedule;
• Estimates the mud, materials, and chemical requirements for stock and for running of all drilling and completion phases; Prepare logistic and supply chain plan for drilling mud/completion fluid.
Requirements
• Bachelor’s degree in engineering or Technical Science. Advanced degree in the above is preferable.
• Minimum 10 years with Drilling Engineering and Operation experience in the Oil & Gas Industry.
INPEX acquired a 100% interest in the Masela Block in November 1998 through an open bid conducted by the Indonesian government authorities and subsequently went about exploratory activities as the operator, discovering the Abadi Gas Field through the first exploratory well drilled in 2000. The Company subsequently drilled two appraisal wells in 2002 and four in 2007–2008, all of which confirmed the presence of gas and condensate reservoirs.In December 2010, the authorities approved the initial plan of development (POD-1) deploying a floating LNG (FL...
More