Office Address : INPEX MASELA, Ltd. Sentral Senayan I, 13th Floor, Jl. Asia Afrika No.8, Jakarta 10270, Indonesia.
Work location : DKI JAKARTA
Country : Indonesia
Published date : 18 hours ago
Deadline date : 26 Apr 2024
Kini Kami hadir dengan sebuah SOLUSI menemukan lowongan kerja lebih mudah dan lebih dekat dengan HRD Perusahaan dengan JOBSMIGAS PREMIUM
Job Description
• Provide technical contributions and assurance to FEED deliverables in the area of Flowline Systems, Riser Systems, Umbilical and Subsea Distribution Systems. Provide expertise relate to hydraulic analysis, subsea material selection, manufacturing and fabrication, offshore installation, pre commissioning and commissioning of associated flowline, Riser and umbilical systems during EPCI. Responsible for advancing certain URF related In-house deliverables from previous project work;
• Provide contribution to SURF FEED ITT tender documents, and manage project value drivers during decision making, working within the scope and cost promises established at contract award. Provide Hazard Management contributions to the URF portion of the project integrating with contractor and In-house HSSE resources;
• Coordinate with EPCI Contractor including Integrated SURF EPCI Supplier and Flexible Riser Supplier in particular to optimize the total installed EPCI cost;
• Responsible for contribution to the local content capability and gap closure plans for local pipe mill suppliers. Under SCM Team coordination, integrate between materials, welding and gas export pipeline resources.
Requirements
• Bachelor’s degree in engineering or any other Technical Sciences.
• A minimum of 10 years with at least 8 years in the Oil and Gas industry. Having minimum 5 years of Subsea project experience. EPCI subsea project experience is preferable.
INPEX acquired a 100% interest in the Masela Block in November 1998 through an open bid conducted by the Indonesian government authorities and subsequently went about exploratory activities as the operator, discovering the Abadi Gas Field through the first exploratory well drilled in 2000. The Company subsequently drilled two appraisal wells in 2002 and four in 2007–2008, all of which confirmed the presence of gas and condensate reservoirs.In December 2010, the authorities approved the initial plan of development (POD-1) deploying a floating LNG (FL...
More